Miami-Dade Dock Permit: DERM Class I
A Miami-Dade dock permit for work over tidal water is a Class I permit from the county's environmental department. For a house dock, how far it reaches into the canal decides which form you file.
Is my dock Class I?
If it sits over tidal water anywhere in the county, yes.
(a) Class I: Class I permits are required to trim or cut a mangrove tree, unless specifically exempt pursuant to the provisions of Section 403.9326, Florida Statutes, as may be amended from time to time, or to alter or remove a mangrove tree anywhere in Miami-Dade County or for any type of work as defined herein to take place in, on, over or upon any tidal waters, bay bottom lands anywhere in Miami-Dade County or in wetlands supporting halophytic vegetation anywhere in Miami-Dade County, including, but not limited to, dredging or filling; provided, however, that class I permits shall not apply to the construction, installation or alterations of outfalls or overflow systems as described under the definition of class II permits (Section 24-48.l(l)(b)).
Short form or standard form?
The number is 25 percent. Measure the waterway, then measure how far the dock, lift and piles would reach.
(I) Short Form Permit Application:
(A) When permissible: A short form permit application may be accepted by the Department for the following types of work:
(3) Repair, replacement or restoration of docks, piers, davits, boat lifts, mooring or fender piles, provided none of the foregoing protrude into the water more than twenty-five (25) percent of the width of the waterway.
(II) Standard Form Permit Application:
(A) A standard form permit application shall be required for the following types of work. A standard form permit application shall also be required for all short form permit applications for which a public hearing has been requested pursuant to Section 24-48.2(I)(B)(1).
(2) Construction or the placement of a fixed or floating dock, davit, boat lift, mooring or fender pile protruding more than twenty-five (25) percent into the width of the waterway.
(4) Construction or the placement of fixed or floating docks, piers, davits, boat lifts, mooring piles and fender piles in order to create fifty (50) or more boat slips at a new or existing boat docking facility.
Can I pull the permit myself?
The dock item on this list covers repairs on single-family lots. A new dock isn't listed.
At the discretion of the Director or the Director's designee, owner-builder permits may be issued for the following types of work requiring a class I permit, and thereby waive the requirement that the permit be issued jointly to the owner and a contractor holding an applicable certificate of competency:
(3) Where the upland property is zoned as single-family residential:
(a) Repair, replacement or restoration of docks which are limited to or less than their original dimensions and which together with associated tie-up facilities, do not protrude into the water more than twenty-five (25) percent of the width of the waterway (excluding pile-driving operations and any associated dredging and filling).
(b) Installation of buoys, when it is determined that the proposed installation will not present a hazard to navigation.